ISS The Swimming Pool Specialists - Standard 7x3 with Steps

The Swimming Pool Specialists

The swimming pool specialists (ISS Construction Company Ltd) specializes in the construction of in-ground swimming pools. We have built hundreds of pools in Pattaya and around Thailand. We are part of a worldwide group “The ISS Group of Companies” with representatives around the world. Part of being a member if the ISS group is to ensure customer service and quality control of our products. We at the Swimming pool specialist (ISS Construction Co Ltd) only install with our pools the best possible quality of equipment available on the market today. We not only stock our own brands of pumps and filters but were are the licensed dealers for top brands names in the Swimming pool industry such as Jacuzzi, Sandia, WaterCo, etc. We at ISS design your pool to be user friendly and almost maintenance free. Your pool will be equipped with an automatic chlorinator feeder which will eliminate the hassle of mixing chemicals and Ph readings to a minimum. Not only that but also our system’s at ISS are set to be fully Automatic. Your pump and filter will turn on and off by itself using a sophisticated Automatic control system. This will ensure minimum power usage. Our main concern at ISS is customer satisfaction. We have both European and Thai Quality control inspectors to help ensure your dream pool becomes a reality.

DSC04391 - Standard 7x3 with Steps
Pool Design Ideas0086 - Standard 7x3 with Steps
Pool Design Ideas0081 - Standard 7x3 with Steps
Pool Design Ideas0082 - Standard 7x3 with Steps
Pool Design Ideas0085 - Standard 7x3 with Steps
Pool Design Ideas0084 - Standard 7x3 with Steps
Pool Design Ideas0074 - Standard 7x3 with Steps
Pool Design Ideas0083 - Standard 7x3 with Steps
Pool Design Ideas0078 - Standard 7x3 with Steps
Pool Design Ideas0079 - Standard 7x3 with Steps
Pool Design Ideas0080 - Standard 7x3 with Steps
Pool Design Ideas0077 - Standard 7x3 with Steps
Pool Design Ideas0072 - Standard 7x3 with Steps
Pool Design Ideas0075 - Standard 7x3 with Steps
Pool Design Ideas0076 - Standard 7x3 with Steps
Pool Design Ideas0071 - Standard 7x3 with Steps
Pool Design Ideas0070 - Standard 7x3 with Steps
Pool Design Ideas0067 - Standard 7x3 with Steps
Pool Design Ideas0069 - Standard 7x3 with Steps
Pool Design Ideas0066 - Standard 7x3 with Steps
Pool Design Ideas0063 - Standard 7x3 with Steps
Pool Design Ideas0062 - Standard 7x3 with Steps
Pool Design Ideas0068 - Standard 7x3 with Steps
Pool Design Ideas0065 - Standard 7x3 with Steps
Pool Design Ideas0064 - Standard 7x3 with Steps
Pool Design Ideas0055 - Standard 7x3 with Steps
Pool Design Ideas0061 - Standard 7x3 with Steps
Pool Design Ideas0060 - Standard 7x3 with Steps
Pool Design Ideas0054 - Standard 7x3 with Steps
Pool Design Ideas0058 - Standard 7x3 with Steps
Pool Design Ideas0059 - Standard 7x3 with Steps
Pool Design Ideas0057 - Standard 7x3 with Steps
Pool Design Ideas0052 - Standard 7x3 with Steps
Pool Design Ideas0056 - Standard 7x3 with Steps
Pool Design Ideas0053 - Standard 7x3 with Steps
Pool Design Ideas0050 - Standard 7x3 with Steps
Pool Design Ideas0049 - Standard 7x3 with Steps
Pool Design Ideas0048 - Standard 7x3 with Steps
Pool Design Ideas0051 - Standard 7x3 with Steps
Pool Design Ideas0047 - Standard 7x3 with Steps
Pool Design Ideas0042 - Standard 7x3 with Steps
Pool Design Ideas0041 - Standard 7x3 with Steps
Pool Design Ideas0032 - Standard 7x3 with Steps
Pool Design Ideas0046 - Standard 7x3 with Steps
Pool Design Ideas0045 - Standard 7x3 with Steps
Pool Design Ideas0043 - Standard 7x3 with Steps
Pool Design Ideas0044 - Standard 7x3 with Steps
Pool Design Ideas0040 - Standard 7x3 with Steps
Pool Design Ideas0039 - Standard 7x3 with Steps
Pool Design Ideas0038 - Standard 7x3 with Steps
Pool Design Ideas0037 - Standard 7x3 with Steps
Pool Design Ideas0036 - Standard 7x3 with Steps
Pool Design Ideas0033 - Standard 7x3 with Steps
Pool Design Ideas0035 - Standard 7x3 with Steps
Pool Design Ideas0024 - Standard 7x3 with Steps
Pool Design Ideas0029 - Standard 7x3 with Steps
Pool Design Ideas0031 - Standard 7x3 with Steps
Pool Design Ideas0025 - Standard 7x3 with Steps
Pool Design Ideas0027 - Standard 7x3 with Steps
Pool Design Ideas0028 - Standard 7x3 with Steps
Pool Design Ideas0030 - Standard 7x3 with Steps
Pool Design Ideas0034 - Standard 7x3 with Steps
Pool Design Ideas0020 - Standard 7x3 with Steps
Pool Design Ideas0021 - Standard 7x3 with Steps
Pool Design Ideas0022 - Standard 7x3 with Steps
Pool Design Ideas0026 - Standard 7x3 with Steps
Pool Design Ideas0023 - Standard 7x3 with Steps
Pool Design Ideas0019 - Standard 7x3 with Steps
Pool Design Ideas0018 - Standard 7x3 with Steps
Pool Design Ideas0017 - Standard 7x3 with Steps
Pool Design Ideas0015 - Standard 7x3 with Steps
Pool Design Ideas0016 - Standard 7x3 with Steps
Pool Design Ideas0014 - Standard 7x3 with Steps
Pool Design Ideas0011 - Standard 7x3 with Steps
Pool Design Ideas0010 - Standard 7x3 with Steps
Pool Design Ideas0013 - Standard 7x3 with Steps
Pool Design Ideas0112 - Standard 7x3 with Steps
Pool Design Ideas0107 - Standard 7x3 with Steps
Pool Design Ideas0012 - Standard 7x3 with Steps
Pool Design Ideas0093 - Standard 7x3 with Steps
Pool Design Ideas0009 - Standard 7x3 with Steps
Pool Design Ideas0002 - Standard 7x3 with Steps
Pool Design Ideas0008 - Standard 7x3 with Steps
Pool Design Ideas0006 - Standard 7x3 with Steps
Pool Design Ideas0111 - Standard 7x3 with Steps
Pool Design Ideas0007 - Standard 7x3 with Steps
Pool Design Ideas0094 - Standard 7x3 with Steps
Pool Design Ideas0005 - Standard 7x3 with Steps
Pool Design Ideas0004 - Standard 7x3 with Steps
Pool Design Ideas0003 - Standard 7x3 with Steps
Pool Design Ideas0109 - Standard 7x3 with Steps
Pool Design Ideas0108 - Standard 7x3 with Steps
Pool Design Ideas0106 - Standard 7x3 with Steps
Pool Design Ideas0113 - Standard 7x3 with Steps
Pool Design Ideas0110 - Standard 7x3 with Steps
Pool Design Ideas0104 - Standard 7x3 with Steps
Pool Design Ideas0103 - Standard 7x3 with Steps
Pool Design Ideas0102 - Standard 7x3 with Steps
Pool Design Ideas0096 - Standard 7x3 with Steps
Pool Design Ideas0088 - Standard 7x3 with Steps
Pool Design Ideas0105 - Standard 7x3 with Steps
Pool Design Ideas0089 - Standard 7x3 with Steps
Pool Design Ideas0098 - Standard 7x3 with Steps
Pool Design Ideas0100 - Standard 7x3 with Steps
Pool Design Ideas0101 - Standard 7x3 with Steps
Pool Design Ideas0095 - Standard 7x3 with Steps
Pool Design Ideas0091 - Standard 7x3 with Steps
Pool Design Ideas0097 - Standard 7x3 with Steps
Pool Design Ideas0099 - Standard 7x3 with Steps
Pool Design Ideas0092 - Standard 7x3 with Steps
Pool Design Ideas0090 - Standard 7x3 with Steps
Pool Design Ideas0087 - Standard 7x3 with Steps
previous arrow
next arrow
ArrowArrow
Slider

 

 

SWIMMING POOL WATER TREATMENT

The difference in owning a pool in Europe or many western countries is the natural elements, i.e. the weather, heat, rain, rain pollution, and of course the water used to fill the pool. Pools filled by town supply water or semi chlorinated water Firstly what is referred to in Thailand as town supply treated water is not the same standard as town supplied treated water in Australia, New Zealand, the USA and many other parts of the world. As you are aware in most of the above countries you can turn on your tap and drink the water with out even filtering it, as it has passed reverse osmosis, UV treatment, chlorination treatment, bromine treatment and is automatically kept at a constant level by computers. And you are aware it is not advised to drink straight from the tap in Thailand or most Asian countries as a mater of fact, so therefore before you can swim in your pool you need to treat it by stripping all the elements and bacteria from the water. Were a pool has been filled with semi chlorinated water this will take about 5 to 7 days providing there is no rain while the stripping process is taking place. To strip the water it is normally done with a shock dosage of chlorine, which will react if it rains, there is also a possibility that the pool water may turn green. If this happens then the water will need to be treated for a longer period. Note: while treating the pool you should not swim in the pool. Once your pool has been stripped of all the bacteria’s etc and elements it will need to be checked with a water testing Kit 3 times per week depending on the size and the amount of use the pool has. The pool should be vacuumed at least 3 times per week to prevent mould build up.

POOLS FILLED WITH UNTREATED BORE WATER OR WELL WATER

Firstly one must understand that due to the temperatures and pollution, not to mention very high iron content in un treated water (Bore Water) it is not the same standard as town supply treated water. even filtered bore water is a haven for bacterial growth and at no time it is advised to drink straight from the tap in Thailand or most Asian countries as a mater of fact, so therefore before you can swim in your pool you need to treat it by stripping all the elements, mold, and bacteria from the water. Were a pool has been filled with non treated water this will take about 7 to 10 days providing there has been no rain while the stripping process is taking place. To strip the water it is normally done with Powder agent called SunSom which is put in the pool with out the pumps being turned on, it will be left for about 24 to 48hrs, this will make all the unwanted elements drop to the floor of the pool. Then the pool will be vacuumed and shock treat it with a high dosage of chlorine, which will react if it rains. There is a possibility the pool water may turn green slightly. If this happens then the water will need to be treated for a longer period. Note : while treating the pool you should not swim in it. Once your pool has been stripped of all the bacteria’s etc and elements it will need to be checked with a water testing Kit 3 times per week depending on the size and the amount of use the pool has. The pool should be vacuumed at least 3 times per week to prevent mould build ups. Sometimes it is often common that after a heavy rain the pool may change color and require a slightly heaver dosage of chlorine or soda hash depending on the readings. There are many forms of treating pools used in the western world such as Europe, Australia, New Zealand, and the USA. However what one must remember is first, in these countries bacteria that causes meningitis, legionnaires disease, hepatitis, typhoid etc are not as commonly found the water systems as they are is Asia. And there is only one chemical that kills all the bacteria that is associated with these problems and that is Chlorine. Most of the modern day treatment systems, like are designed for pools in European countries

THINGS TO REMEMBER

The color of you water has nothing to do with the filtration system its clarity is controlled by chemicals such as soda ash, chlorine, acid etc. all the filters do, is filter the solids from the water. From the first day water is placed into your pool it may look clear however when the stripping process takes place the color will change and get very murky at first, it will most likely go green for 3 days depending on the size of your pool. Then it will change to a milky white color for three more days. After this it will start to clear up. The process can take up to 10 days. Building a pool is not like building a house, there will be some days we will not be at your site however you can rest assured we will be on time in accordance with our contract. Once we reach each hand over point of the contract we will stop work and wait for your acceptance of the said works. Once this is signed by our QI inspector and you the customer and the invoice for that section has been paid we will then re commence the next stage of work. Due to the fact we build sometimes up to 20 pools at the same time we use a crew system meaning re rotate from site to site, we have a steel crew, concrete crew, plaster crew, piping crew and then our technician. These crews rotate between sites and due to this some days works may not be scheduled for your site; however we can assure you are built into our schedule which will ensure the completion of your pool in the time frame stipulated.

Terms and Conditions:

  1. Deposit upon signing 10%
  2. 1st Payment: day one of site excavation 20%
  3. 2nd Payment: steel laid ready to pour floor of pool 20%
  4. 3rd Payment: Walls cement work finished 15%
  5. 4th Payment: tiles completed 15%
  6. 5th Payment: Sand wash and pump house completed  10%
  7. 6th Payment: connection of pumps and filters 10%

The Purchaser is responsible for the following items:

  1. Power and water to the worksite, clear and safe work environment
  2. Supplying of town supply water to fill the pool upon completion.
  3. Mains electricity / water to the pump house.
  4. Clear site access for equipment to construct the said Pool

 

 

Fill in this form and we will respond with a basic free estimate within 48 hours.

This is only an estimate and the actual price may vary depending on extras, material cost variations, site conditions and other considerations and other variables. The final price can only be ascertained after an in-person meeting and a complete site inspection.

 


Tell Us What You Need

Please let us know the dimensions of your pool. (In Meters)
Length, Width, Shallow End and Deep End


Average Depth: m
Volume: Cubic Liters

Total Estimate: ฿

 

This pool is a rectangle pool using standard lite blue tiles 4” x 4” available in lite or dark blue (TCI). It is a direct return system using a skimmer which intern does not need a holding tank. This price excludes decoration, such as rock work plants etc. The pool as steps leading into the pool, the price includes pump house of 2m x 2m x 1.5m high, 2 underwater lights and a 70cm surrounding foot path in sand wash. Estimated time to complete this pool 70 days

SKU: ISS/0003

Pool Description

Tile:
Standard 4″x4″ TCI
Pool reference Number:
ISS/0003
Pool length:
7 m
Pool average width:
3 m
Depth:
1.10 – 1.60  m
Back